Expert in Construction Reduces Waiting Times and Mailing Expenses

MDM in the Construction Industry - Case Study

Case Study: PERI GmbH

The Mission: 

Construction plans are send by plane to international construction sites, resulting in high cost and delays.

The Solution: 

With Cortado Server construction plans are emailed and printed out to DIN A0-Plotters directly from a BlackBerry smartphone on site, via Bluetooth.

The Result:

Saving cost for sending the construction plans and enhancing productivity on construction sites (no delays for waiting on current construction plans anymore).

By using Cortado we’re able to eliminate considerable time delays and thus save considerably on cost. We can now react flexible and fast to any changes. The site managers are enthusiastic.

— Rainer Backeler, PERI GmbH

Facts:

  • Industry: Construction
  • Solution: Cortado Server
  • Hardware: BlackBerry smartphones, MPI Tech Bluetooth Printer Adapter
  • Environment: BlackBerry Enterprise Server
  • Partner: Advanced Solution GmbH

Download Case Study (PDF)