Medical Engineering Improves Productive Efficiency

Case Study | Medical Engineering Improves Productive Efficiency

Case Study: Integrated Medical Systems International, Inc.

The Mission: 

Customer signature needed on delivery documents on site.

The Solution: 

With Cortado Server service technicians print the delivery documents on the spot and get the signature on site.

The Result:

Less back office activities, increased productivity, avoid conflicts with customer that were based on bad quality/readability of delivery documents, avoid mistakes due to inadvertence.

Cortado Server enhanced productivity and profitability. The solution also enabled us to standardize pricing and avoid slip of the pen.

— Lee Robinson Jr., Integrated Medical Systems International

Facts:

  • Industry: Medical Services
  • Solution: Cortado Server
  • Hardware: BlackBerry smartphones, MPI Tech USB Printer Adapter

Download Case Study (PDF)